GI pipe price list 1-inch GI pipe

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-07-18 07:08

  • Browse the number:

    87

Send an inquiries
+
Shanxi Solid Industrial Co.,Ltd.
Contactaixin:

Contactaixin:

steeltubing(Mr.)  

Email:

telephone:

Area:

Beijing

Address:

1501, Building B, Dingyuan Times Center, Yingzenanjie, Taiyuan, Shanxi, China (030001)

Website:

http://steeltubing.hkmp2012.com/

+
Model Number: DPBD-DXY-43 Brand Name: DPBD Key Specifications/Special Features: Specifications of the galvanized pipe:1) Shapes: round2) Product range: 16-273mm (round)3) Standards: ASTM A53, AS1163, JIS G3444, IS1161, IS1239, BS1387, EN39, IS4923, TIS276, TIS2774) Technique: welded5) Length: 3.0, 3.05, 3.75, 5.8, 6, 9, 11.8 and 12m or according to the requirements of the customers6) Surface: pre-galvanized or hot-dipped galvanized7) Packing details: in bundle or wrapped with PVC or according to the requirements of the customers8) End finish: plain end, beveled end, threaded end, threaded with one end coupling and the other end plastic cap9) Inspection: with visual inspection, dimension testing, nondestructive testing, hydraulic testing, eddy current, infrared test, flattening test, bent test and metallographic testWhy choose us?
1-The whole packing activities are all conducted indoors, in order to keep the pipe body dry and avoid the possible rust in the pipe body. Our products all have tight packing. Especially in the course of transportation, all the products are covered around tightly by the high quality PVC materials so as to protect the pipes from the harsh environment. We usually use the weatherproof canvas of quality to cover around pipes before the shipment, so as to maintain the pipe performance in the storage yard.

2- our warehouse is a kind of indoor installation which can prevent rain from eroding steel pipes. After production of steel pipe, we also have a indoor package so as to protect products without rain erosion. All these measures are taken into consideration in the interest of our customers. Under the harsh environment such as rainy or snowy, we can also handle our products including packing because all the activities with regard to steel pipes are processed indoor. So no matter what happened your order can be placed according to our original plan which can avoid a delayed delivery date.
Shipping Information:
  • FOB Port: Tianjin
  • Lead Time: 15 - 30 days
  • Dimensions per Unit: 600 × 60 × 60 Centimeters
  • Weight per Unit: 1 Metric Tonnes
  • Units per Export Carton: 25
  • Export Carton Dimensions L/W/H: 11.95 × 2.34 × 2.35 Meters
  • Export Carton Weight: 3.4 Metric Tonnes
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe